  • Waukeuha Gas Engine

    LOCATION:

    White Tiger Oil field, Vietnam

    DESCRIPTION:

    The project is located offshore within the White Tiger Oil Field, on Vietsovpetro’s Gas Compressor Platform in Vietnam. GEP UK who has expert procurement and supply chain management was awarded the contract to supply spare parts for Waukesha Gas Engine model No. 12V-AT27-GL.

  • Schlumberger Wastewater Recycling Modules

    LOCATION:

    Aktobe, Kazakhstan

    DESCRIPTION:

    GEP UK was commissioned to design, build and install four module wastewater recycling plants at the Schlumberger Mega base in Aktobe. The system was designed to remove Oil, Suspended Solids and Chemical Surfactants to meet the design parameters of, oil 0.05mg/l, suspended solids 3.0mg/l and chemical surfactants 10mg/l. Module main equipment included multi-stage filters, clean water storage tanks, pump station, control station, sludge transit storage tanks.

  • Ahwaz Preheaters

    LOCATION:

    Ahwaz, Iran

    DESCRIPTION:

    In order to reach a better performance on existing desalting plants at Ahwaz production area, a project for the supply and installation of salty crude and dilution water indirect heaters is defined. Eight heaters shall be installed in four desalting plants. Each plant will be equipped with one heater for crude oil and one for dilution water. The heat capacity for heaters are 8 MW for crude and 4 MW for water respectively. The project includes basic and detail design, supply of heater vessels, burners, burner management system (BMS), instruments and piping material, installation of all items, implementation of new heaters on existing plant, commissioning. This will increase the efficiency of desalting plant and reduce the value of salt to desired figure of 29 PPM and BS&W to 0.15% volumetric content.
     

  • Ghaleh Nar Desalting plant

    LOCATION:

    Ghaleh Nar

    DESCRIPTION:

    This is a project to establish a new desalting plant adjacent to an existing production unit. The desalting capacity is 20000 BPD. The project consists of a two stage desalting chain, dilution water package, effluent treatment package, flare system, desulphurization package and chemical dosing packages. All utilities to support the new build are also included, consisting of, fire waters system, electrical supply, instruments and control systems and all related pumping equipment.

  • NGL 1000, Iran Gas Precompression System

    LOCATION:

    Pazanan Gas Reservoir

    DESCRIPTION:

    NGL 1000 was installed in 1978 and is feeding the domestic natural gas network. The plant treats raw natural gas and separates the sweet natural gas and light liquid hydrocarbons. The capacity of the plant is 700 MMSCD (million standard cubic feet per day). Due to a reduction in supply pressure a precommpression unit was needed. The precommpression unit consisted of 4 trains (3 operating and 1 standby), each consisting of a Knock Out Drum, Compressor and Gas Cooler. Each train has a capacity of 250 MMSCD and increases the gas pressure from 100 Barg to 160 Barg.

  • Electrochlorination System

    LOCATION:

    South Pars Development 15&16

    DESCRIPTION:

    South Pars Development 15&16 required an Electrochlorination system to prevent organic fouling in the onshore and offshore cooling water pipeline. The system provides 3ppm of Hypochlorite of continuous dosing and 5ppm of shock dosing every 8 hours for 30mins. The units have a total capacity of 145kg per hour of Hypochlorite.

  • Assaluyeh Seawater Filtration System

    LOCATION:

    Kavian Petrochemical Plant

    DESCRIPTION:

    Kavian Petrochemical plant produces two million tonnes of Ethylene per year supplying the downstream petrochemical plants. This plant required an input of 94,000 M³/h of water. This is supplied through a seawater intake system, the system required 9 automatic self-cleaning filters each with a maximum capacity of 11,000 M³/H and able to filter out particles which are over 1000 microns in size. The filters needed to have an automatic backflush mechanism in order to maintain a constant flow of water into the plant.

  • Seawater Filtration System

    LOCATION:

    South Pars Development 15&16

    DESCRIPTION:

    South pars development 15&16 has a sea water intake system supplying water to various processes and cooling systems. The scope of this project was to provide adequate filtration for some of the processes which required sea water. These filters, due to constant duty, needed to be of an automatic backflush variety to minimise down time and loss of flow. The filters were designed to filter out any coarse particle over 500 microns in size.

  • Marun 2 Desalting Development Plant, Ahwaz, Iran Marun 6 Desalting Mobilizing Plant

    LOCATION:

    Ahwaz, Iran

    DESCRIPTION:

    As a result of the increase in the salt content of the crude oil in the aging wells, it becomes necessary to implement a process to separate the salty water from the crude oil. Using flushing water and admitting crude to pass through an electro static field, the salt molecules are separated from the mixture to leave the crude with negligible salt content. Marun 2 & 6 desalting plants are located in Ahwaz, Khuzestan province, Iran.

  • Heater Treater Unit

    LOCATION:

    Arabian Gulf Oil Co., Libya

    DESCRIPTION:

    144" ID X 50'0" T/T Horizontal electrostatic Heater Treater
    12 mm Btu/hr
    25,000 BPD
    Final assembly preformed Montreal, Quebec
    Project completed May 2005, Arabian Gulf Oil Company, Libya
    This unit is a comb ination of a heater and a separator, which heats the raw crude in hazardous environments, i.e. refinery, oil&gas production unit and will treat the heated oil for purification. The combined unit is well suited for hard to reach areas.

  • Desalter / Production Units

    LOCATION:

    Arabian Gulf Oil , Libya

    DESCRIPTION:

    144" ID X 70'0" T/T Horizontal electrostatic dehydrator
    96" ID X 30'-0" T/T Separator
    Each system utilises a horizontal electrical grid system; here a three tear grid system is utilised; live upper and lower grids and an earthed middle grid, providing a deep AC field. Crude oil is fed into the dehydrator/desalter using a specially designed distribution header which is positioned beneath the electrical grid assembly, thus ensuring even flow through the AC electrical field. Subjected to the high voltage electrostatic field, the water droplets coalesce and separate from the oil.

  • Arvand Petrochemical Company PVC1 & PVC2 Cooling Towers

    LOCATION:

    Mahshahr, Iran

    DESCRIPTION:

    Two concrete cooling towers with circulating water rate of 12000 m³/hr for PVC1 and 16000 m³/hr for PVC2. The main part of the cold water flows through dual media filters to reduce the suspended solids. Chemical dosing units are considered due to the low quality of the inlet water and in order to follow the environmental safeguards various chemical treatments units have been implemented as follows:

    - Sodium Hypochlorite Dosing unit
    - Dispersant Dosing unit
    - Biocide Dosing unit
    - Sulphuric Acid Dosing unit

  • Khouzestan Steel Complex Cooling Towers

    LOCATION:

    Ahwaz, Iran

    DESCRIPTION:

    This project involves the design, supply and construction of a new cooling tower (12300 M³/ hr) and revamping an existing one (6150 M³/hr) for the cooling of electric (Arc) furnaces of the Ahwaz steel complex in Ahwaz, southern province of Khouzestan in Iran. The Scope of the project covers the total project management including; detailed design, field engineering, procurement, construction, fabrication, installation, commissioning as well as end user staff training.

  • Production Separator (66" O.D. x 30' T/T 3 Phase)

    LOCATION:

    Arabian Gulf Oil Company, Nafoora Field, Libya

    DESCRIPTION:

    This unit separates gas, water and oil from raw crude, in order to increase the efficiency of the oil field equipment in transporting the oil to its final destination while reducing the corrosion in the equipment, pipeline and the shipping vessel.

  • Cheshmeh Khosh Oil Field Production Unit Development Project

    LOCATION:

    Khouzestan Province, Iran

    DESCRIPTION:

    The subject of this project is the modification and upgrading of an existing unit (Bank A) which processes the sweet crude. It also includes the design and manufacturing as well as erection and commissioning of units B & C (Bank B, Bank C) for the treatment of salty/sour crude oil. A 9KM 4" pipeline has also been constructed for the transfer of water from the reservoir to the production units.

  • Skid Mounted Automated Oil Well Manifold

    LOCATION:

    Arabian Gulf Co., Libya

    DESCRIPTION:

    Design Pressure 1440 Psig 18" Production header and 8" test header
    Utilizing wellhead manifolds has enabled continuous production of oil wells while one well is taken off for crude testing. This combination of piping, valves and control valves maximizes production while keeping the crude flowing.

  • Esfahan Refinery Wet Cooling Tower

    LOCATION:

    Esfahan, Iran

    DESCRIPTION:

    Covering all aspects of Civil, Mechanical, Process, Electrical and Instrumentation and Control principles, this project is to deliver a counter-flow (Air and Water) wet cooling system for the Esfahan Oil Refinery. The capacity of the tower is 14800 M³/hr and is designed in one unit consisting of 6 cells. Related facilities include the pumping station, turbines, condensers, chemical dosing units, pipe work as well as all electrical and Instrumentation and control systems.

  • Arak Refinery

    LOCATION:

    Arak, Iran

    DESCRIPTION:

    This water treatment plant supplies the required demin water for the steam boilers at the refinery. This plant with the capacity of 200m³/hr is operating alongside two previously installed lines. The new production line has been designed to work automatically and be controlled by a fully automated control system.

  • Control and Automation of Sea Water Intake

    LOCATION:

    Mobin Petrotechnical Complex, Assaluieh, Iran

    DESCRIPTION:

    Control and Automation of sea water intake and cooling water distribution plant at the Mobin Petrochemical complex was the subject of this project. The utilisation of full redundancy design principles, combined usage of Profibus-DP, Mod Bus and Ethernet, enabled the provision of service for a variety of users with different requirements, ranging from the operator to control and engineering stations. 

    By interfacing with the existing systems, (Mobin CCR, ESD and F&G) this system was connected to the existing DCS and historical archive, supporting various report and trend monitoring/recording systems. Also included were the alarm and RTU in local production units and fail safe ESD system and conventional mimic panel, as well as the integration of quality monitoring systems (analyzers, flow, level and chemical composition) of the distributed water system.

  • Horizontal 3 Phase Fired Heater Treater

    LOCATION:

    Arabian Gulf Oil Company, Majid Field, Libya

    DESCRIPTION:

    (120" O. D. x 45 T/T, 6.0 mm BTU/HR, 30,000 BPD)
    This unit is a combination of a heater and a separator, which heats the raw crude in hazardous environments, i.e. refinery, oil/gas production unit and will treat the heated oil for purification, i.e. removal of water and salt. The combined unit is well suited for hard to reach areas.

  • South Pars Project

    LOCATION:

    Persian Gulf, Iran

    DESCRIPTION:

    This project consisted of four units of demin water production, potable water production, service water production, and chemical sources. The demin water system consisted of three units with a capacity of 45m³/hr each. The potable water unit consisted of two units with a capacity of 30m³/hr each. This formed the total utility supply of South Pars Project phase one.